Skip to main content

About the Cosmic Ray Detector

Cosmic Ray Detector 

  • Background 
  • Wrapping Paddle (PowerPoint)
  • Set-up and Operation
    • Checklist for bringing the cosmic ray detector to school: Four cosmic ray detector paddles Four 50ft signal extension cables Four 50ft power extension cables Power distribution box Power cable for distribution box (6ft male to male connectors) Power supply for circuit board 6ft serial RS-232 Cable Serial to USB adapter Voltmeter used to plateau paddles Laptop with Cosmic Ray Detector program
  • Journal 

Cosmic Ray Labs 

Appendices 

Last Updated: Apr 10, 2026 3:00 PM

PDFs on this page are part of the Department of Physics and Astronomy Web Archive. They are no longer maintained and may not meet web accessibility standards. To request them in an accessible format, contact the department at dsiple@purdue.edu.

Department of Physics and Astronomy, 525 Northwestern Avenue, West Lafayette, IN 47907-2036 • Phone: (765) 494-3000 • Fax: (765) 494-0706

Copyright © 2026 Purdue University | An equal access/equal opportunity university | Copyright Complaints | DOE Degree Scorecards

Trouble with this page? Accessibility issues? Please contact the College of Science.