 
ACCELERATOR LOCKOUT PROCEDURE
| 1. |
Alert the operator(s) that power is being disconnected. |
| 2. |
Preparation for Shutdown |
| 3. |
Equipment Shutdown |
| 4. |
Equipment Isolation |
| 5. |
Application of Lockout Devices |
| 6. |
Control of Stored Energy |
| 7. |
Equipment Isolation-Verification |
|