 
ACCELERATOR LOCKOUT PROCEDURE
1. |
Alert the operator(s) that power is being disconnected. |
2. |
Preparation for Shutdown |
3. |
Equipment Shutdown |
4. |
Equipment Isolation |
5. |
Application of Lockout Devices |
6. |
Control of Stored Energy |
7. |
Equipment Isolation-Verification |
|