P_2x5_098_A-5

Production testing

Date:10/20/2006

Operator: Isaac Childres

start testing time:10:44 AM

Sensor: S_2x5_098, Data for leakage current measurement , and plot on overall it is a GOOD sensor
ROCROC waferLabel
ROC0XX4JPAT46B
ROC1XX4JPAT46A
ROC2X14JP6T05D
ROC3XX4JPAT45D
ROC4X14JP6T05B
ROC5XX4JPAT48A
ROC6XX4JPAT48B
ROC7XX4JPAT48D
ROC8XX4JPAT49A
ROC9X74JP0T39D

This plaquette has been reworked. Old Data available at P_2x5_098_A

Inspected by Graves Durand on date 9/15/2006
LR_dev0.047
LL_dev0.051
FINAL COMMENT by Graves DurandNo assembly problems. No wirebonding problems.

PLAQUETTE made READY for testing on 9/15/2006 by Graves Durand

PLAQUETTE TESTED on 2006-09-18 by Gino Bolla

[IMAGE] of
IV_XML-File
Maximum Voltage 290 V
[IMAGE] of
LASER_XML-File
Depletion Voltage 44 V
Operational Voltage 84 V

ROCROC0ROC1ROC2ROC3ROC4ROC5ROC6ROC7ROC8ROC9
Ibias_DAC157149147145153151146151165147
Vana12912612313713012614499143123
Cal_Del85747677827670978285
Vthrs_Comp69897078857380587778
Unbumped0000000000
Dead0030000000
Noisy0000000000
Undecoded0001000010
Total BAD0031000010

ASSEMBLY_XML-File SUMMARY_XML-File, and SUMMARY_PER_ROC_XML-File
[IMAGE] of I_BIAS_DAC_XML-File
[IMAGE] of VANA_XML-File
[IMAGE] of DEAD_XML-File
[IMAGE] of NOISY_XML-File
[IMAGE] of UNDECODED_XML-File
[IMAGE] of LIGHT_XML-File

PLAQUETTE READY FOR SHIPPING

Depletion Voltage is -10 and suggested operational voltage is -50
Ibias_DAC, Ibias_DAC Data 157 151 148 146 155 152 147 152 166 147
Vana, VanaData 74 134 127 129 141 98 151 84 123 65
CalDelData and plots0081855608011000
VthrCompData and plots00005600000
TestDdata ,TestD Plots0416029232428416003290413741604160
LightData ,Light Plots0000000000
Pass/Fail TestD GOOD BAD BAD BAD BAD GOOD BAD BAD BAD BAD
Pass/Fail LIGHT GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD

Comment (if any): Something fried this plaquette. It's not really working at all.

This Device have been tested 5Times prior to this one and here are the links to the previous tests:

P_2x5_098_A-1.html,

P_2x5_098_A-2.html,

P_2x5_098_A-3.html,

P_2x5_098_A-4.html,

P_2x5_098_A.html,

End testing time: 11:01 AM